PRODUCTION BASE
Dongchuan Base

In December 2022,the Company signed a cooperation agreement with Dongchuan District of Kunming City for an annual production capacity of 20GW of monocrystalline silicon rods,with a total investment of RMB 5 billion.After the project is completed,the expected annual output value can reach RMB 16.4 billion,tax revenue is about RMB 400 million.It is expected to create more than 3,000 jobs,which will inject a strong impetus into the industrial transformation and development of Dongchuan.
The project will occupy a land area of approximately 26 hectares, with a planned construction area of around 260,000 m2. It includes a raw material cleaning workshop, a crystal pulling workshop, a silicon rod machining workshop, a chemical warehouse, a material storage yard, an employee canteen, a water supply and circulating station, a wastewater treatment station, an argon recovery system, a control system, a finished product warehouse, a fire water storage tank and pump room, a temporary silicon mud depository and a solid waste storage facility.


